Seychelles EU Connection
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Hopeful optimism with ongoing road works

Go down

Hopeful optimism with ongoing road works Empty Hopeful optimism with ongoing road works

Post  Sirop14 Tue Sep 04, 2018 7:52 pm


Today in Seychelles
8 hrs ·
Monday 3 September 2018

Infrastructure

Hopeful optimism with ongoing road works

The streets of Mahé are getting the ‘facelift’ they deserve through increased construction for public infrastructure like gutters, drains and appropriate pipelines, These run under soon to be well developed side walks and pavements.
https://www.facebook.com/todayinsey/posts/1826024277435374?__tn__=K-R

Sirop14

Posts : 26853
Join date : 2008-06-02

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum